Helios Energy Operations · 4 March 2025
Your portfolio is operating at 96.8% of its potential.
6 findings are open across 2 sites. The largest single loss is on Ring3 Inverter 1 at Apollo2_New.
Portfolio health
Health score out of 100
SOL Morning Brief
Good morning. Your solar portfolio is operating at 97.2% of expected performance.
One issue requires attention today. Ring3 Inverter 1 continues to lose energy. Estimated loss since yesterday is 214 kWh, worth about €24.
No new site wide incidents were detected overnight.
This month at a glance
1 February to 3 March 2025
Energy produced
223.5MWh
Estimated energy loss
7.4MWh
Estimate based on peer comparison
Estimated financial loss
€814
At 0.11 EUR per kWh
Sites requiring attention
1
1 high severity issue
What needs attention
Sorted by business impact, not by the time each issue appeared
- 1HighApollo2_New · Ring3_Inverter131 days91%High confidence
Persistent insulation resistance condition on Ring3 Inverter 1
Recommended next: Inspect DC cabling and connectors on the affected strings for moisture and damage
3,204 kWh
€352 lost
- 2MediumApollo2_New · Ring3_Inverter226 days64%Moderate confidence
Possible MPPT imbalance on Ring3 Inverter 2
Recommended next: Compare string layout and orientation against the design documentation
486 kWh
€53 lost
- 3MediumApollo2_New · Ring4_Inverter29 days76%Moderate confidence
Elevated internal temperature on Ring4 Inverter 2
Recommended next: Inspect and clean ventilation paths and filters
138 kWh
€15 lost
- 4LowApollo2_New · Ring2_Inverter119 days58%Low confidence
Possible MPPT imbalance on Ring2 Inverter 1
Recommended next: Add a visual check of this array to the next scheduled site visit
264 kWh
€29 lost
- 5LowApollo2_New · Ring1_Inverter234 h99%High confidence
Missing measurement intervals on Ring1 Inverter 2
Recommended next: Re-export the period from the monitoring platform if the raw data is required
0 kWh
€0 lost
Sites
2 connected sites · 14 inverters · 2 open maintenance tasks
Apollo2_New
1,200 kW installed · Albania
- Current production
- 742 kW
- Performance
- 95.9% of expectation
- Active incidents
- 4
- Data connection
- Historical file import
HPP Banja 50kW Rooftop
50 kW installed · Albania
- Current production
- 31.4 kW
- Performance
- 99.1% of expectation
- Active incidents
- 0
- Data connection
- Historical file import
Production trend
Apollo2_New, daily energy against expectation
Daily energy against expectation
Units: kWh per day
What to notice: The red portion of each bar is the energy SAVA estimates you should have produced. 10 February shows the site wide shutdown.