HPP Banja 50kW Rooftop
50 kW installed, 2 inverters, commissioned 2024. The site is producing at 99.1% of expectation right now.
Site health
Health score out of 100
Current production
31.4kW
Energy this period
8.9MWh
Expected 9 MWh
Estimated loss
0.2MWh
€26
Availability
99.4%
Inverter comparison
An underperforming device stands out immediately against its peers
Inverter comparison for the period
Units: MWh produced
What to notice: Both rooftop reference inverters produced almost identical energy, which is expected for co-located units.
Inverter status over time
A quick view of where and when problems occurred
Inverter status over time
One cell per device per day
| Device | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 01 | 02 | 03 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Roof_ref_0degr | |||||||||||||||||||||
| Roof_ref_22deg |
What to notice: Both devices ran normally across the period.
Daily energy
Produced energy and estimated loss per day
Daily energy against expectation
Units: kWh per day
What to notice: Loss is estimated from peer expectation and shown on top of produced energy.
Inverters
Open a device for technical detail
Open incidents at this site
Data quality
Data problems are kept separate from equipment problems