Reports
Reporting period: 1 February to 3 March 2025.
Energy produced
223.5MWh
Performance against potential
96.8%
Value of lost production
€593
Recovered through maintenance
€115
Daily production and losses
Actual output with the shortfall stacked above
Daily energy against expectation
Units: kWh per day
What to notice: Each bar is one day at Apollo2_New. The pale band is energy the plant should have produced but did not.
Where the losses came from
Grouped by the kind of problem SOL detected
Insulation resistance condition
1 findings
3,204 kWh
€352
Underperformance
1 findings
1,145 kWh
€126
MPPT imbalance
2 findings
750 kWh
€83
Site wide shutdown
1 findings
142 kWh
€16
Temperature anomaly
1 findings
138 kWh
€15
Unexpected shutdown
1 findings
12 kWh
€1
Missing data
1 findings
0 kWh
€0
Site summary
Actual against expected energy for the period
| Site | Actual | Expected | Availability | Health |
|---|---|---|---|---|
| Apollo2_New | 214.6 MWh | 223.8 MWh | 98.1% | 88 |
| HPP Banja 50kW Rooftop | 8.9 MWh | 9 MWh | 99.4% | 96 |
Findings in the period
Everything SOL raised, with the date it began
Persistent insulation resistance condition on Ring3 Inverter 1
01 Feb 2025 · Apollo2_New
High€352Site wide shutdown detected at Apollo2_New
10 Feb 2025 · Apollo2_New
Medium€16Possible MPPT imbalance on Ring3 Inverter 2
06 Feb 2025 · Apollo2_New
Medium€53Possible MPPT imbalance on Ring2 Inverter 1
12 Feb 2025 · Apollo2_New
Low€29Shutdown records reviewed at HPP Banja rooftop
01 Feb 2025 · HPP Banja 50kW Rooftop
Information€1Missing measurement intervals on Ring1 Inverter 2
18 Feb 2025 · Apollo2_New
Low€0Elevated internal temperature on Ring4 Inverter 2
22 Feb 2025 · Apollo2_New
Medium€15String underperformance on Ring1 Inverter 3
08 Feb 2025 · Apollo2_New
Medium€126