All tasks
HighIn progressTASK-201
Investigate insulation resistance condition on Ring3 Inverter 1
SAVA detected a persistent insulation resistance condition with an estimated loss of 3.2 MWh since 1 February. Inspect the DC side of this inverter and identify the affected string.
Apollo2_New · Ring3_Inverter1 · due 06 Mar 2025 · INC-1042
Before you start
DC voltages remain present while the array is illuminated. Isolate, lock off and verify zero voltage before touching any conductor.
Inspection checklist
2 of 6 steps complete
Repair report
Attach photographs of the repair (available on the mobile app).